IFC Hydro-Analytics


Final Projects Results
 Hydrometeorological Testbeds (HMT Project)

Mix and Match Simulations
Models: HLM and NWM, run in Open Loop mode
Time Period: 2016 to 2018
QPE products: MRMS, IFC, IFC Dual Polarization
Data Assimilation: None

Visit

 USGS Streamflow

Historical and Real-Time Streamflow Data Browser

Visit

IFC-HLM Development
 HLM Model Structure Evaluation

Retrospective simulations of different HLM configurations
Models: Original HLM model and different configurations to include tiling drainage
Time Period: 2002 to 2018
QPE products: Stage 4 and MRMS (where available)

Visit

 Data Assimilation Effect

Expected Data Assimilation Effect for Iowa Communities

Visit

FORECASTING EVALUATION
 NWS Forecast

Current NWS forecast for Iowa

Visit

 Analysis Based on Issue Time

Real Time Forecasts produced during 2020
Models: HLM and NOAA NWM runs
QPE product: HLM uses MRMS + IFC rainfall; NWM uses MRMS and HRRR
QPF product: HRRR (18 hrs)
Lead Time: 10 days for HLM; 18 hours for NWM
Data Assimilation: For HLM starting on March 4; for NWM during the whole period

Visit

 Analysis Based on Lead Time

Real Time Forecasts produced during 2020
Models: HLM and NOAA NWM runs
QPE product: HLM uses MRMS + IFC rainfall; NWM uses MRMS and HRRR
QPF product: HRRR (18 hrs)
Lead Time: 18 hours for both models
Data Assimilation: For HLM starting on March 4; for NWM during the whole period

Visit

 Analysis Based on Lead Time (Extended)

Real Time Forecasts produced during 2020
Model: HLM
QPE product: MRMS + IFC rainfall
QPF product: HRRR (18 hrs)
Lead Time: 10 days
Data Assimilation: starting on March 4th

Visit